Close cooperation for a successful planning of your biogas plant


http://en.planet-biogas.com/planning/

—–

A Waste Management Solution for 430+ Customer Partners Worldwide.

https://jcgregsolutions.wordpress.com/2018/09/30/a-waste-management-solution-for-430-customer-partners-worldwide-2/

Advertisements

Improved Monitoring of Semi-Continuous Anaerobic Digestion of Sugarcane Waste: Effects of Increasing Organic Loading Rate on Methanogenic Community Dynamics


https://pdfs.semanticscholar.org/367f/01e396ecf3bd0d13af97e41a7912b6ed2532.pdf

If you have a sugar mill and you want your waste turned into resources and profit.

https://jcgregsolutions.wordpress.com/2018/05/29/if-you-have-a-sugar-mill-and-you-want-your-waste-turned-into-resources-and-profit/

PlanET Biogas Plant Construction Track Record


http://en.planet-biogas.com/wp-content/mediathek/171120_Reference-Liste-International_all-PlanET-plants-world-wide.pdf

———–

A Waste Management Solution for 430+ Customer Partners Worldwide.

https://jcgregsolutions.wordpress.com/2018/09/30/a-waste-management-solution-for-430-customer-partners-worldwide-2/

A Waste Management Solution for 430+ Customer Partners Worldwide.


We are PlanET Biogas Global GmbH based in Vreden, Germany.

Our company eliminates the need for ever increasing organic waste landfill, aerobic lagoons, and chemical treatment to manage and control waste. We have turned organic waste into resources to generate power in over 430 Waste-to-Energy (W2E) biogas/biomethane plant construction projects all around the world.

Also, we offer free service to do project feasibilty, sustainability, and ROI study based on your given waste data- analyze, quantify, qualify, and assess its potential for a possible W2E project.

A Project Budgetary Concept Proposal (BCP) and a Consultancy Service Proposal (CSP) will be submitted for your consideration if the endeavor would greatly add to your bottom-line. A study result with an ROI of less than 5 years.

If you have organic waste that you wanted to turn into resources, interested to know its Waste-to-Energy (W2E) potential, wanted to avail of our free assessment services, and look forward to receive an idea of a project concept and cost about it, do email me the kind of industry you are in so I can send you a questionnaire that you can fill up and resend to us:

gregoriojess@yahoo.com

j.gregorio@planet-biogas.com

Looking forward to serve you.

Jess C. Gregorio

PlanET Biogas Global GmbH

Philippines

Email: j.gregorio@planet-biogas.com

Email: gregoriojess@yahoo.com

Website: http://en.planet-biogas.com/

Biogas Reference Site:

https://jcgregsolutions.wordpress.com/category/solutions-biogas/

Reference Biogas Plant in the Philippines:

https://jcgregsolutions.wordpress.com/2018/09/28/a-chicken-layer-and-hog-farm-that-does-not-smell-at-all-generates-own-power-too/

Reference Landfill Replacement Project:

https://jcgregsolutions.wordpress.com/2018/07/15/largest-ad-plant-in-alberta-secures-revenues-long-term-2/

If you have Mall Restaurants, Hotel, and Market Food Waste and Wanted to Turn it into Resources and Profit.


If you have food waste and want it turned into resources and profit.

Our company eliminates the need for ever increasing organic waste landfill, aerobic lagoons, and chemical treatment to manage and control waste. We have turned organic waste into resources to generate power in over 430 Waste-to-Energy (W2E) biogas/biomethane plant construction projects all around the world.

The purpose of this data gathering is to offer you a free service to do project feasibilty, sustainability, and ROI study based on your given waste data- analyze, quantify, qualify, and assess its potential for a possible W2E project.

A Project Budgetary Concept Proposal (BCP) and a Consultancy Service Proposal (CSP) will be submitted for your consideration if the endeavor is to your advantage and would greatly add to your bottom-line. A study result with an ROI of less than 5 years.

We can help you assess the potential of your organic waste and recommend ways to increase your bottomline. Just answer the questions below and email to

j.gregorio@planet-biogas.com

Full Contact Name:

Company Name:

Address:

Position:

Landline Nos.:

Mobile Nos.:

Email Address:

Website:

Foodwaste Generation:

Tons/day?

Tons/month?

Tons/year?

Type (dry/wet)?

Breakdown of organic waste (%):

bread?

vegetables?

fruit?

rice?

cereals?

used oil?

all the rest?

Biogas from waste data:

What is your application Idea for Biogas:

Fuel to fire and run your boilers adding more steam generation (y/n)?

Wastewater treatment using Anaerobic Digestion (y/n)?

CHP, heat for process, gas engine coupled to generator (y/n)?

Have existing biogas system (Y/N)?

If Yes, describe types?

individual Anaerobic Digester Volumes (m3)?

Country of technology and mfg origin?

Working or not (Y/N)?

Efficiency of biogas generation from organic waste (%)?

Type of organic waste you produce, include all?

What is their individual moisture content for solids (%), dry matter content for liquid (%)?

Available quantity for each:

ton/day?

ton/week?

ton/month?

ton/year?

Have remaining open area for anaerobic digester tanks installation, mixing tanks, digestate tank, solid/liquid separator, biogas/biomethane feed system, containerized control room (m2)?

Electrical Power Generation:

Grid connection possible?

How far is the nearest NGCP transformer (km)?

How much total power do you consume per month (KW)?

How much does it cost you (PhP)?

Power consumption in a year (KW)?

Cost of your power for one year (PhP)?

Have existing Power Generator (Y/N)?

Type (steam turbine, gas engine, etc)?

Individual Steam Turbine Generating Capacities (Kw, MW)?

Total Existing Power generating capacity (KW or MW)?

Excess Generated Power (KW, MW)?

If you already sell this, how much do you sell it (PhP/KW or MW)?

If not and you plan to sell excess power from your biogas power plant, how much do you think can you sell it to:

1. Local Electric Coop (PhP/KW) ?

2. Identified private power buyer in your area (PhP/KW) ?

3. NGCP, if they still have grid capacity to accommodate your excess power (PhP/KW)

Do you have a condensing steam turbine (Y/N)?

What is the generation capacity of this particular condensing steam turbine (kw, mw)?

How much superheated steam does it need (kg/hr)?

At what pressure (barg)?

What is its superheat temperature above steam saturation point (Deg C)?

No. of Hours of Operation per Month (hrs/month) ?

No. of Hours of Operation per Year (hrs/year) ?

Boiler Data:

Do you have boilers (Y/N)?

Type of each boiler (enumerate and describe each)?

Steaming rate of each boilers (kg/hr)?

Boiler Feedwater Temperature (Deg C)?

Estimated Boiler Efficiency of each Boiler (%)?

Fuel of each boiler?

Moisture Content of Solid Fuels (%)?

Fuel Feeding Technology of each boiler?

Operating Pressure of each boiler (Barg)?

Individual Boiler combustion efficiency (%)?

Feedwater Temperature (Deg.C)?

Pressure of Deaerator (Barg)?

If steam is Superheated, what temp per boiler (DegC):

Have boiler continuous blowdown heat recovery for eah boiler?

boiler operating cost (PhP/day, per week, per month, per year)?

Cost to buy each type of your boiler fuel (PhP/Ton, PhP/Liter, PhP/cubic meter)?

If you have free residual waste as your boiler fuel, how much would you internally cost it (PhP/Ton, PhP/Liter, PhP/cubic meter)?

Please forward latest boiler fuel lab analysis and breakdown?

Estimated boiler flue gas particle scrubbing or containment cost per month (PhP/month)?

per year (PhP/month)?

Estimated boiler ash management cost per month (PhP/month)?

per year (PhP/year)?

Wastewater Treatment Data:

Total power consumption of wastewater treatment section only per month (KW/month) ?

per year (KW/year)?

Total Operational Cost of wastewater treatment per month (PhP/month)?

per year (PhP/year)?

How many wastewater lagoons do you currently have?

How deep are your lagoons (meters)?

What is the total retention period of water on your aerobic lagoons (days)?

Flowrate of wastewater going into the lagoons from manufacturing (liters/min, gpm)?

Temperature of wastewater coming into the lagoon(Deg.C)?

Dry matter percentage of wastewater going into the lagoon (%)?

What is your chemical treatment overhead cost per liter of wastewater (PhP/liter)?

Details of each chemical used, amount of usage,and their cost:

Name of Chemical (list all)?

Usage per month of each chemical (liter/month, kg/month)?

Usage per year of each chemical (liter/year, kg/year)?

Cost of each kind of chemicals (PhP/liter, PhP/kg)?

Total Operational Cost on chemical treatment alone, (PhP/month)?

per year (PhP/year)?

Do you have a current sludge retention problem (stench and volume) and wish to solve it (y/n)?

Estimated total volume of sludge in your lagoons (%) ?

Estmated sludge specific management cost do you incur per month (PhP/month)?

per year (PhP/year)?

What is your total volume of lquid on all the aerobic lagoons you have (liter, cubic meter)?h

How many pumps do you have in your wastewater treatment/wwtp?

What are their individual HP ratings?

No. of Hours of Operation per Month (hrs/month) ?

No. of Hours of Operation per Year (hrs/year) ?

Hor many motor for blowers do you have for aeration purposes?

What are their individual HP ratings (HP)?

No. of Hours of Operation per Month (hrs/month) ?

No. of Hours of Operation per Year (hrs/year) ?

Any special treatment other than common ones installed? What are these?

Please forward latest wastewater lab analysis?

Please forward latest residual solid waste lab analysis and breakdown?

Republic Act 9513 or the Renewable Energy Act of 2008. RE Project Tax Holidays and Incentives from the government

Willing to take effort to register RE project with DOE and other required agencies to avail of governmental incentives (y/n)?

IncomeTax Holiday (y/n)?

Ten percent corporate tax rate (y/n)?

Ten year duty-free importation of RE machinery, equipment and materials (y/n)?

Net Operation Loss Carry-Over (NOLCO) of seven years (y/n)?

Zero percent value-added tax (VAT) rate (y/n)?

Special realty tax rates on equipment and machinery (y/n)?

Accelerated depreciation (y/n)?

Cash incentive given to RE developers for missionary electrification (y/n)?

Tax exemption of carbon credits (y/n)?

Tax credit on domestic capital equipment and services (y/n)?

Exemption from the universal charge (y/n)?

Payment of transmission charges (y/n)?

Hybrid and cogeneration systems (y/n)?

Benefit of a priority dispatch (y/n)?

Incentives for RE commercialization (y/n)?

Feed-in tariff (y/n)?

Project Schedule Information:

If project is feasible and beneficial, approved to be set in place, when do you think would be the most convenient month to start project mobilization (month of the year)?

What month would you desire to have the project finished to serve your purpose and objectives (month of the year)?

How many months is your typical time span for capex oriented project decision making procedure (nos. of months)?

Looking forward to serve you.

Jess C. Gregorio

PlanET Biogas Global GmbH

Email: j.gregorio@planet-biogas.com

Email: gregoriojess@yahoo.com

Website: http://en.planet-biogas.com/

Biogas Technology Reference Site:

https://jcgregsolutions.wordpress.com/category/solutions-biogas/

Reference Biogas Plant in the Philippines:

https://jcgregsolutions.wordpress.com/2018/09/28/a-chicken-layer-and-hog-farm-that-does-not-smell-at-all-generates-own-power-too/

Reference Landfill Replacement Project:

https://jcgregsolutions.wordpress.com/2018/07/15/largest-ad-plant-in-alberta-secures-revenues-long-term-2/

A Waste Management Solution for 430+ Customer Partners Worldwide.


A Waste Management Solution for 430+ Customer Partners Worldwide.

We are PlanET Biogas Global GmbH based in Vreden, Germany.

Our company eliminate the need for ever increasing organic waste landfill, aerobic lagoons, and chemical treatment to manage and control waste. We turn waste into fuel resources to generate power. Recommend ways to start Waste-to-Energy (W2E) Projects.

We provide a free-of-charge simple project feasibilty, sustainability, and ROI study based on given waste data. Our Biogas/Biomethane Design Engineers will analyze, quantify, qualify, assess potentials of a given waste data. If interested to have one for your particular application, kindly completely fill up questionnaire found on the link below:

https://jcgregsolutions.wordpress.com/2018/08/16/more-fuel-to-extend-operations-and-generate-more-excess-power/

A Project Budgetary Concept Proposal (BCP) and a Consultancy Service Proposal (CSP) will be submitted for your consideration if the W2E project potential you have is feasible, sustainable, and have less than 5 years ROI. It will be a nice company cost saving and additional profit project to implement.

For interested non-sugar industry company, do reply on the kind of industry you are in and we will email corresponding questionnaire that you can fill up.

Looking forward to serve you.

Jess C. Gregorio

PlanET Biogas Global GmbH

Email: j.gregorio@planet-biogas.com

Email: gregoriojess@yahoo.com

Website: http://en.planet-biogas.com/

Biogas Reference Site:

https://jcgregsolutions.wordpress.com/category/solutions-biogas/

A Chicken Layer and Hog Farm that does not smell at all. Generates own power, too.


Jess C. Gregorio

PlanET Biogas Global GmbH

Email: j.gregorio@planet-biogas.com

Email: gregoriojess@yahoo.com

Website: http://en.planet-biogas.com/

Biogas Reference Site:

https://jcgregsolutions.wordpress.com/category/solutions-biogas/

SOLAR ROOF TOP INSTALLATIONS IN THE PHILIPPINES


https://www.doe.gov.ph/5-how-it-done-solar-roof-top-installations-philippines

—-

Ad.

Turn your passive rooftops into power generating area.

The maximum dimension of a rooftop solar system depends on the area of the roof, so rooftop solar systems are usually small compared to ground-mounted photovoltaic power stations. Rooftop solar systems on residential buildings typically feature a capacity of about 5 to 20 kilowatts (kWp); but on commercial or industrial buildings can reach up to 1-2 Megawatts = 1000-2000 kWp (or more in rare cases of very big industries.

About rooftop solar power system.

https://jcgregsolutions.wordpress.com/2018/04/25/the-advantages-of-rooftop-solar-systems/

Let me calculate the potential for power generation of your available rooftop area and submit a project costing for your reference, evaluation, and consideration.  Do answer questions below and email back to me gregoriojess@yahoo.com

Name:

Title:

Company:

Company Address:

Tel:

Fax:

Email:

Mobile Phone Nos.:

Roof Solar Installation Site Address:

Estimated Roof Surface Area:

Roof Sloping Angle:

Where roof face most? east, west,north, south:

Do send pics of roof taken from 4 different angles i.e. east, west, north, south

Do attach the latest power bill you’ve got. 2 would be nice. three consecutive months would be best:

Frequent Questions about Anaerobic Digestion


https://www.epa.gov/anaerobic-digestion/frequent-questions-about-anaerobic-digestion

Why decide for an agricultural biogas plant?


http://en.planet-biogas.com/what-is-biogas/

A Waste Management Solution for 430+ Customer Partners Worldwide.

We are PlanET Biogas Global GmbH based in Vreden, Germany.

Our company eliminate the need for ever increasing organic waste landfill, aerobic lagoons, and chemical treatment to manage and control waste. We turn waste into fuel resources to generate power. Recommend ways to start Waste-to-Energy (W2E) Projects.

We provide a free-of-charge simple project feasibilty, sustainability, and ROI study based on given waste data. Our Biogas/Biomethane Design Engineers will analyze, quantify, qualify, assess potentials of a given waste data. If interested to have one for your particular application, kindly completely fill up questionnaire found on the link below:

https://jcgregsolutions.wordpress.com/2018/08/16/more-fuel-to-extend-operations-and-generate-more-excess-power/

A Project Budgetary Concept Proposal (BCP) and a Consultancy Service Proposal (CSP) will be submitted for your consideration if the W2E project potential you have is feasible, sustainable, and have less than 5 years ROI. It will be a nice company cost saving and additional profit project to implement.

For interested non-sugar industry company, do reply on the kind of industry you are in and we will email corresponding questionnaire that you can fill up.

Looking forward to serve you.

Jess C. Gregorio

PlanET Biogas Global GmbH

Email: j.gregorio@planet-biogas.com

Email: gregoriojess@yahoo.com

Website: http://en.planet-biogas.com/

Biogas Reference Site:

https://jcgregsolutions.wordpress.com/category/solutions-biogas/