Biogas and biomethane in France: what does the future hold?


According to 2016 data, France has 780 operational biogas plants producing over 6TWh of biogas, and 26 biomethane plants. Feedstocks, feed-in tariffs, drivers and barriers to development: we discuss all this with Bruno Deremince of the EBA. Overall, investments by companies and a commitment to research paints a rosy future for the industry.

Watch and Learn. Click here.

Ad.

Anaerobic Digestion. Biogas. W2E.

We do Biogas plant design, construction and consultancy. We offer German power and waste treatment technology and solutions for any kind of organic waste.

Small and compact automated anaerobic digester

https://pin.it/rycpqfszlk6h3g

Medium to large automated digester tank farm system, 100 to 2MWH power generation.

https://pin.it/bgyd4d7ts32lyu

Large to super large lagoon type mixed and automated anaerobic digestion systems, 200 to 22MW power generation.

https://pin.it/ou4hoysjia5xor

Reference Biogas Plant in the Philippines:

https://pin.it/qerjh2fswevmld

We’ve done over 400+ biogas plant around the world.

Build-Operate-Transfer (BOT) for W2E of 500KWe (and above) from waste conversion is available. We can assess, validate, verify project sustainability and feasibility, design a matched system for your kind and quantity of substrate, and offer a corresponding solid or liquid waste tank or lagoon based biogas or biomethane plant.

Jess C. Gregorio

Philippine Sales Manager

PlanET Biogas Global GmbH

Email: j.gregorio@planet-biogas.com

Email: gregoriojess@yahoo.com

Website: http://en.planet-biogas.com/

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s